Progressive Solutions, Inc. makes every effort to respond quickly to our customer’s urgent requests. All key employees involved in installation projects are prepared to respond to critical situations and urgent requests as they occur. Whether an emergency situation is directly related to the actions of Progressive Solutions or not, our aim is to assist our customers during critical situations in any capacity, in order to minimize their potential loss or degradation of service.

EF&I of All Major Transmission/Switching Equipment
- “Black Box” Switch installation: Switch, DACS, Router, etc.
- Copper & F/O: DSX-1, DSX-3, DDP-1, DDP-3, F/O LGX etc.
- Central Office/Equipment Area Build-out: Aux Framing, Cable Rack, Fiber Protection Systems.

EF&I of All DC Power Equipment
- Main Power Plants: Tyco, Marconi, Peco II, Astec/Emerson, etc.
- Battery Strings: Wet-Cell, Gel-Cell, Battery Disconnect Switches
- Converter Plants, Ring and Tone Machines, Alarm Annunciators
- BDFB’s, BDCBB’s, Local Bay Distribution Fuse/Circuit Bkr Panels
- Digital and Analog CPU Controller Programming.

EF&I of AC Power Equipment - Office Load Side of Switchgear
- Power Distribution Service Cabinets
- Inverters, UPS, etc.
- Area Lighting, Equipment Base Outlets, etc.

EF&I of Disaster Recovery Operations
- Troubleshooting and Service Restoration
- Emergency Response/Rapid Deployment Mobilization
- 24/Hr, 7 Day/Wk schedules available

MWBE
•Progressive Solutions, Inc. is committed to MWBE designated spending
•Progressive Solutions, Inc. supplements their Installation force with an MWBE Certified source
•Progressive Solutions, Inc. actively seeks and utilizes MWBE Certified Distibrutors

Additional Services
•Warehousing, Logistics, and Rigging Services
•Equipment Test & Turn-up Services
•Project Management/Supervision Services
•Equipment and Material Procurement

NOTE: All Additional Services are not only available when complementing Progressive Solutions, Inc. Installation and/or Engineering requested, but are also available as “Stand-Alone” Services.



Services Offered

Engineering
Project Management
Rigging
Material Procurement
Installation
Warehousing (10,000 Sq. Ft.)
Transportation
Collocation
-- Removals
--Asset Recovery
--Cable Mining
--Hazardous Waste Disposal

More Information

Technological Experience

Tellabs 5500 and 532L DACS,
and Echo Canceller equipment

Astec Advanced Power Systems
(Nortel) RPM 5000 and MFA150
DC Power Plants

Nortel Networks Access Node,
OC12, OC48, OC192, DMS
(100, 250, 500)

Alcatel Litespan

Cross Connect – ADC, Telect,
Lucent, Siecor, Trompeter

Fiber Optic – ADC, Telect, Siecor,
Lucent

DSL – Nokia (Diamond Lane),
Harris, Turnstone

Batteries – GNB, Exide

Voicemail – Lucent Octel

BDFB – Lucent, PICO II


More Information
 
Copyright (c) 2005. Progressive Solutions Inc., All rights reserved,